Design of Building Systems Is Systematically Sequenced and Interdisciplinarily Coordinated

5.2 Mechanical Systems Design 5.2.1 Concept Design Phase 5.2.2 Schematic Design Phase 5.2.3 Design Development Phase

5.2.3 Design Development Phase

The mechanical design team develops system zoning, equipment layouts, and schematic diagrams for HVAC, plumbing, drainage, and fire suppression systems. Their scope in this phase includes:

  • Finalizing system types, zoning strategies, and preliminary equipment sizing
  • Developing duct, pipe, and riser layouts for each system based on architectural coordination
  • Refining shaft sizes, plant room allocations, and vertical distribution strategies
  • Performing energy and load calculations to validate system selections
  • Identifying control strategies and interface requirements with electrical and BMS systems

Mechanical consultants must ensure that systems meet comfort, safety, and code requirements, while fitting within the architectural and structural constraints.

Tasks
1.0 Review Approved Schematic Design and Feedback
2.0 Confirm Scope, Budget, and Performance Requirements
3.0 Validate System Fit with Site and Architecture
4.0 Refine Mechanical System Zoning and Layout
5.0 Perform Detailed System Sizing and Equipment Selection
6.0 Develop System Diagrams and Control Strategy
7.0 Perform Energy, Sustainability, and Acoustic Analysis
8.0 Prepare Mechanical Layout Drawings and Details
9.0 Prepare Mechanical Technical Specifications
10.0 Prepare Mechanical Bill of Quantities (BOQ)
11.0 Update Mechanical Design Basis Report (DBR)
12.0 Finalize Design Development Submission Package
5.2.4 Construction Documents Phase 5.2.5 Bidding Phase