Design of Building Systems Is Systematically Sequenced and Interdisciplinarily Coordinated

3.2 Architectural Design Phases 3.2.1 Concept Design Phase 3.2.2 Schematic Design 3.2.3 Design Development Phase 3.2.4 Construction Documents Phase

3.2.4 Construction Documents Phase

Architectural teams are responsible for finalizing the design of all spaces, details, and finishes, and ensuring alignment with client expectations and interdisciplinary coordination. Key deliverables include:

  • Final General Arrangement (GA) plans, elevations, and sections with all dimensions and tags
  • Detailed room layouts, wall/ceiling/floor finishes, wet area details, and joinery
  • Final door and window schedules, material legends, and section cuts
  • Technical specifications and coordinated BOQs for architectural elements
  • Integration of coordination feedback from mechanical and electrical disciplines (e.g., ceiling space, shaft sizes)

The architectural output must be precise, graphically clear, and fully constructible, leaving no ambiguity for contractors.

Tasks
1.0 Finalize Construction Scope and General Notes
2.0 Finalize GA Plans, Sections, and Elevations
3.0 Prepare Detailed Room Layouts and Fit-Out Plans
4.0 Finalize Wall, Floor, and Ceiling Details
5.0 Finalize Door, Window, and Joinery Schedules
6.0 Finalize Wet Area and Specialized Space Details
7.0 Finalize External Works and Site Coordination
8.0 Finalize Vertical Transportation Drawings and Details
9.0 Finalize Fire and Life Safety Drawings
10.0 Finalize Construction Sections and Envelope Interfaces
11.0 Prepare Architectural Specifications (CSI Format)
12.0 Prepare Architectural Bill of Quantities (BOQ)
13.0 Submit Complete Architectural Construction Document Package