Design of Building Systems Is Systematically Sequenced and Interdisciplinarily Coordinated

5.2 Mechanical Systems Design 5.2.1 Concept Design Phase 5.2.2 Schematic Design Phase 5.2.3 Design Development Phase 5.2.4 Construction Documents Phase

5.2.4 Construction Documents Phase

Mechanical consultants finalize the design and documentation of HVAC, plumbing, drainage, and fire protection systems. Deliverables focus on constructability, code compliance, and clarity of scope. Key activities include:

  • Final floor-level layouts, equipment rooms, shaft coordination, and service distribution
  • Detailed schematics for HVAC, water supply, drainage, and fire suppression systems
  • Equipment schedules, sizing tables, and installation details
  • Technical specifications for all mechanical systems and components
  • Coordination with architectural ceiling heights, risers, and structural constraints

Mechanical designs must align with fire and energy codes, accessibility, and installation feasibility, ensuring that all mechanical systems are ready for tendering and execution.

Tasks
1.0 Finalize HVAC Construction Layouts
2.0 Finalize Plumbing and Drainage Construction Layouts
3.0 Finalize Fire Suppression System Layouts
4.0 Finalize Mechanical Plant Room and Shaft Coordination
5.0 Prepare Mechanical System Installation Details
6.0 Finalize Mechanical Schematics and Control Diagrams
7.0 Prepare Mechanical Equipment Schedules
9.0 Finalize Mechanical Zoning, Access, and Clearance Plans
9.0 Prepare Mechanical Technical Specifications (CSI Format)
10. Validate System Compliance with Energy and Fire Codes
11.0 Prepare Mechanical Bill of Quantities (BOQ)
12.0 Coordinate Submission with Architectural and Electrical Teams
13.0 Submit Complete Mechanical Construction Document Package